Restoration work will be carried out in phases.

We have carried out extensive surveys of the Bridge using Lidar scanning, level surveys, photogrammetry and manual measurement. CAD drawings of every part have been prepared, to which details of corrosion and plate-thicknesses have been added. These drawings enable us to refine restoration decisions and de-risk the project.

Brunel Swivel Bridge Drawing 1849
Bob Watkins, one of our volunteers has been producing amazing CAD drawings of all the parts of the Bridge.
Click here to see them

Bob on the bridge
We have photographs from the inspections of the bridge that were done in 2015 and 2017
Click here to see them